Administration Fees
|
Item |
Description/Notes |
Amount
|
Work on behalf of a ratepayer or as a result of an order (i.e. By-law infraction)
|
Includes Employee time (based on current employee rate), Equipment time (based on current Ontario Provincial Standard Specification), Materials/Contracts and a 15% Administration Fee (based on project cost)
|
Actual Costs plus 15% Administration Fee to a max. of $1,000 for Administration Fee
|
NSF Fees
|
|
$40.00
|
Preparation of property aerial photos - per property
|
HST Included
|
$10.00 HST Included
|
Invoice Finance Charge added to any invoice balance not paid before its due date
|
Per Month
|
2% Per Month
|
Debenture added to Taxes Carrying Cost - From Invoice due date to First Instalment date.
|
Carrying cost added to debenture set up amount.
|
Bank Prime + 2%
|
Credit Card Payment Surcharge
|
|
2%
|
A penalty charge for after hours, non-emergency locates request called in as emergencies
|
Penalty
|
$250.00
|
Delivery of tax notices or documents by registered letter
|
|
Actual Cost plus $5 Administration Fee and HST
|
Photocopies
|
Per Page
|
$0.50 HST Included
|
Faxes
|
Per Page
|
$1.00 HST Included
|
Commission Documents/ Affidavits
|
|
No Charge
|
Additional Blue box
|
|
$13.00 HST Included
|
Lottery Licence Application
|
Max. set by AGCO
|
3% of Prize Value / Min $20
|
Municipal Investigators |
per attendance |
$50.00 plus mileage |
Work order information relating to each assessed parcel
|
|
$50.00 plus $15.00 for rush. Rush - certificate required 2 working days or less from the time request received. |
Tax certificate relating to each assessed parcel
|
|
$50.00 plus $15.00 for rush. Rush - certificate required 2 working days or less from the time request received. |
Water certificate
|
|
$50.00 plus $15.00 for rush. Rush - certificate required 2 working days or less from the time request received. |
Septic certificate
|
|
$130.00 plus $20.00 for rush. Rush - certificate required 2 working days or less from the time request received. |
Zoning Report (written) information relating to each assessed parcel
|
|
$50.00 plus $15.00 for rush. Rush - certificate required 2 working days or less from the time request received. |
Composters
|
|
$25.00 HST included - based on Green Lane subsidy |
Marriage Licences and Services
|
Marriage licence - Residents
|
|
$100.00
|
Marriage licence - Non-residents
|
|
$110.00
|
Marriage ceremony
|
at municipal office during regular business hours
|
$250.00
|
Marriage ceremony
|
at off-site location
|
$350 plus mileage
|
Fence Viewers
|
Fence Viewers -Administrative Costs
|
Actual costs
|
Remuneration - $60.00 for each attendance up to a maximum of two hours, and then $60.00 for each hour thereafter, plus mileage
|
Fence Viewers
|
Up to 2 hours |
$180.00 plus mileage
|
Fence Viewers
|
Each hour over initial 2 hours
|
$180.00 plus mileage
|
Cemetery Plot Fees
|
Lake Line - Hunter Cemetery
|
Plot fee |
$300.00 |
Parks Signature Memorial/ Commemorative Bench Fee
|
Bench fee includes installation |
$2,500.00 |
|
Canine Control
|
Item
|
Description/Notes
|
Amount
|
Kennel License
|
|
$85.00 |
Guide Dogs & Service Dogs
|
|
No Charge |
Please note effective January 1, 2022, residents are no longer required to purchase a dog tag from the Township of Southwold.
The requirement of pet owners to identify their dog will now be the responsibility of the pet owner. Each owner is to obtain their own tag with owner contact information clearly displayed. The identification tag must include a phone number for the owner of the dog and must be of sufficient size and contrast to be easily read.
For more information, please visit our Dog Licences page.
|
Fire Department
|
Item
|
Description/Notes
|
Amount
|
Inspections
|
|
$100.00 plus HST
|
Request for Fire Report
|
|
$50.00 plus HST
|
Request for Inspection Report Previously Completed
|
|
$40.00 plus HST |
Fire Cost Recovery for non-compliance of Fire Code and Fire Protection and Prevention Act
|
|
In accordance with current MTO rates plus any loss of or damaged equipment and material used. Plus HST.
|
Provincial Highway Fees
|
|
In accordance with current MTO rates plus any loss of or damaged equipment and material used. Plus HST.
|
Any Municipal Road, all Non-Residents
|
|
Same fee as if on a Provincial Highway
|
|
Building and Community Services
|
Building Services |
Item | Description/Notes | Amount |
1st Floor |
|
$0.65 per ft2 |
2nd Floor and 3rd Floor |
|
$0.65 per ft2 |
Basement |
|
$0.40 per ft2 |
Crawl space |
|
$0.40 per ft2 |
Workshops, storage areas, garages, open porches and decks, when included with permit for a new residence and attached to the same |
|
$0.20 per ft2 |
Addition of attached garage workshop
|
|
$0.65 per ft2 |
Additions, alterations and renovations where square footage can be determined as per above |
|
See fees per ft2 above |
Additions of attached garages |
|
$0.65 per ft2 |
Fee for any building permit, alterations/renovations |
|
Minimum - $150.00 |
When square footage cannot be determined |
|
$12.00 per $1,000.00 of construction value. Minimum - $150.00 |
Damage and Lot Grading Security Deposit at discretion of CBO |
Forfeited if occupied prior to occupancy being granted |
Minimum $2,000.00, maximum $3,500.00 |
Accessory when not part of original residential permit |
Less than 250 ft2 |
$150.00 |
Accessory when not part of original residential permit |
251 to 500 ft2 |
$150.00 plus $0.35 per ft2, over 250 ft2 |
Accessory when not part of original residential permit |
501 ft2 to 1,000 ft2 |
$300.00 plus $0.15 per ft2, over 500 ft2 |
Accessory when not part of original residential permit |
Over 1,000 ft2 |
$350.00 plus $0.15 per ft2 over 1,000 ft2 |
Industrial/Commercial/Institutional - New construction or renovations |
|
$12.00 per $1,000.00 of construction value - minimum $150.00 |
Farm Building - Livestock facilities and manure pits |
|
$150.00 plus $8.00 per $1,000.00 of construction value |
Farm Building - non livestock |
Less than 250 ft2 |
$150.00 |
Farm Building - non livestock |
251 to 500 ft2 |
$150.00 plus $0.35 per ft2 over 250 ft2 |
Farm Building - non livestock |
501 to 1,000 ft2 |
$300.00 plus $0.15 per ft2 over 500 ft2 |
Farm Building - non livestock |
Over 1,000 ft2 |
$350.00 plus $0.15 per ft2 over 1,000 ft2 |
Woodstoves, chimneys, fireplaces and other wood burning appliances |
|
$150.00 |
Demolition permits |
|
$150.00 |
Demolition as a condition of severance |
|
$150.00 |
Fence around residential swimming pools |
|
$150.00 |
Building relocations |
|
$100.00 plus travel cost plus fee for appropriate building listed above |
Building relocations |
Deposit / liability insurance |
Refundable damage deposit and/or liability insurance to be determined by Council |
Plumbing permit in buildings not requiring a building permit |
|
$150.00 plus $12.00 per $1,000.00 of construction value |
Tent permit |
Greater than 60 m2 |
$150.00 |
Wind turbine |
with a capacity greater than 3 kW for personal use |
$295.00 |
Wind turbine |
with a capacity greater than 3 kW for commercial use |
$2,000.00 |
Change of use permit |
No construction |
$150.00 |
Conditional permit |
|
$300.00 plus regular permit fee and cost recovery on any additional legal, professional or consultant fees plus 15% Administration Fee to a max. of $1,000 for Admin Fee |
Reinspection fee |
if inspections are requested and not ready |
$150.00 |
Solar panel |
with an area of 5 m2 or greater |
$150.00 |
Penalty for starting construction prior to obtaining permit - residential |
|
Double regular permit fee - maximum $2,000.00 |
Penalty for starting construction prior to obtaining permit - industrial/commercial/institutional |
|
Double the regular permit fee - maximum $5,000.00 |
Administration fee for permits not paid prior to permit expiry |
|
25% increase in regular permit fee |
Fast track building permit fee 48 business hour turn around at discretion of CBO |
|
25% increase in regular permit fee |
Permits not started within six months of issue are cancelled and require renewal, if applicant requests in writing within one year of cancellation |
|
$150.00 |
Alternative Solution Review Fee |
|
$300.00 |
Sewage system building permits for Class 4 or 5 sewage systems |
|
$500.00 |
Additional fee for percolation onsite test where soil conditions are suitable |
|
$100.00 |
Inspection for repairs to a sewage system |
|
$400.00
|
|
Community Services |
Community Services | Description/Notes | Amount |
Keystone Complex - Main Hall - without facilities |
Friday to Saturday |
$450.00 HST included |
Keystone Complex - Main Hall - with facilities |
Friday to Saturday |
$600.00 HST included |
Keystone Complex - Grounds - private event |
Friday to Saturday |
$600.00 HST included |
Keystone Complex - Grounds - Southwold based charities, service clubs and non-profit groups |
Friday to Saturday |
$470.00 HST included |
Keystone Complex - Non-refundable deposit |
Friday to Saturday |
$200.00 HST included |
Maintenance and Damage Deposit (event serving alcohol, refundable upon inspection)
|
Keystone Complex and Grounds |
$800.00 no HST |
Keystone Complex - Maintenance and damage deposit |
Fee waived for Southwold based charities, service clubs and non-profit groups |
$100.00 no HST |
Keystone Complex - Main Hall - without facilities |
Sunday to Thursday |
$330.00 HST included |
Keystone Complex - Main Hall - with facilities |
Sunday to Thursday |
$390.00 HST included |
Keystone Complex - Main Hall - Southwold based charities, service clubs, and non-profit groups |
Sunday to Thursday |
$265.00 HST included |
Keystone Complex - Grounds - Private Event |
Sunday to Thursday |
$360.00 HST included |
Keystone Complex - Grounds - Southwold based charities, service clubs, and non-profit groups
|
Sunday to Thursday |
$300.00 HST included |
Keystone Complex - non-refundable deposit |
Sunday to Thursday |
$200.00 no HST |
Keystone Complex - Sporting events and events serving alcohol require insurance |
Applicant to provide proof of coverage |
|
Keystone Complex - Set-up day ahead |
|
$270.00 HST included |
Keystone Complex - Meeting room |
|
$55.00 HST included |
Keystone Complex - Meeting room - with kitchen |
|
$85.00 HST included |
Keystone Complex - Memorial services and funeral receptions |
|
$225.00 HST included |
Keystone Complex - Sign & Letters |
|
$25.00 HST included |
Keystone Complex - Pavilion |
|
$90.00 HST included |
Keystone Complex - Horse ring |
|
$75.00 HST included |
Keystone Complex - Barn |
|
$120.00 HST included |
Maintenance and Damage Deposit (refundable upon inspection) Sporting events and events serving alcohol require insurance |
Fingal Heritage Park
Fee waived for Southwold based charities, service clubs and non-profit groups
|
$200 no HST |
Gazebo |
Fingal Heritage Park |
$50.00 HST included |
Mens and Ladies ball |
Fingal Ball Park |
$47.00 / game, HST included |
Minor sports (baseball or soccer) |
Fingal Ball Park |
$5.00 / child, per season, HST included |
Local Tournaments |
Fingal Ball Park
Available only for Southwold based service clubs, not for profit groups and registered charities, and Southwold based, affiliated Minor Sports Associations (includes use of pavilion)
|
$120.00 / day, HST included |
Non-Local Tournaments |
Fingal Ball Park (includes use of pavilion)
|
$250/diamond/day HST included |
Pavilion |
Fingal Ball Park |
$80.00 HST included |
Maintenance and Damage Deposit (refundable upon inspection) Tournaments, events using the concession stand, and events serving alcohol require insurance |
Fingal Ball Park
Fee waived for Southwold based charities, service clubs and non-profit groups
|
$800 no HST |
Concession Stand (damage and maintenance deposit required) |
Fingal Ball Park |
$50/day, HST included |
Mens and Ladies ball |
Shedden |
$42.00 / game, HST included |
Adult soccer (19+) - full field, full length games |
Shedden |
$37.00 / game, HST included |
Adult soccer (19+) - mini field, 2 hours |
Shedden |
$22.00 / game, HST included |
Minor sports (baseball or soccer) |
Shedden |
$5.00 / child, per season, HST included |
Pavilion |
Corsley Park |
$80.00 HST included |
Mens and Ladies ball |
Talbotville |
$42.00 / game, HST included |
Minor sports (baseball or soccer) |
Talbotville |
$5.00 / child, per season, HST included |
Adult soccer (19+) - full field, full length games |
Talbotville |
$37.00 / game, HST included |
Local Tournaments |
Talbotville |
$120.00 / day, HST included |
Maintenance and Damage Deposit (refundable upon inspection) Sporting events and events serving alcohol require insurance |
Talbotville Optimist Park (Sports & Heritage)
Fee waived for Southwold based charities, service clubs and non-profit groups
|
$800 no HST |
Pavilion |
Talbotville |
$80.00 HST included |
Non-registered Teams |
|
Applicable fee plus $12.00, HST included (practice or game) |
Due Date |
All fees shall be paid by no later than the first regular season game and a copy of the game schedule and applicable forms shall be provided to the Township at that time |
|
Late payment fees |
|
$12.00 / game, HST included, applicable to each game scheduled or played until payment received |
Rain days |
Teams can reschedule games during the week or at the end of the season |
|
Insurance |
Teams shall be responsible to provide a copy of their own insurance to the Township prior to the first game |
|
|
|
Infrastructure and Development
|
Item | Description/Notes | Township Fee | Lower Thames Valley Conservation Authority Fee |
Tile Loan Processing
|
|
$200.00
|
|
Drainage Apportionment Agreement - 1st Drain / Apportionment Agreements allocating all assessment to one property
|
The Township of Southwold reserves the right to decide whether the apportionment is done in-house or by the Engineer. Referral to an Engineer for Drainage Reapportionment is at the discretion of the Municipality. If referred to an Engineer, costs will be actual amounts charged by the Engineer.
|
$100.00
|
|
Drainage Apportionment Agreement - Each additional drain
|
|
$75.00
|
|
Minor Variance Application (section 45(1) to 45(3) of the Planning Act)
|
|
$900.00
|
$115.00 review fee
|
Official Plan Amendment Application (includes planning report)
|
LTVCA - Major OPA - industrial, commercial, institutional, subdivision, etc.
LTVCA - Minor OPA - single lot / unit residence
|
$1,750.00
|
Major OPA $300.00 review fee
Minor OPA $200.00 review fee
|
Zoning By-law Amendment Application (includes planning report)
|
LTVCA - Major ZBLA - industrial, commercial, institutional, subdivision, etc.
LTVCA - Minor ZBLA - single lot / unit residence
|
$1,350.00
|
Major ZBLA $300.00 review fee
Minor ZBLA $200.00 review fee
|
Combined application to amend the Official Plan and Zoning By-law in respect of the same lands (includes planning reports)
|
|
$2,000.00
|
$275.00 review fee |
Temporary Use By-law (Section 39 and 39.1 of the Planning Act)
|
|
$1,125.00 |
|
Temporary Use By-Law - Refundable Deposit
|
|
$5,000.00 fully refundable upon compliance |
|
Site Plan Application |
|
$1,000.00 plus actual cost for in-house and external review of Development Proposals - see below
|
|
Plans of Subdivision/Plans of Condominium application |
|
$2,000.00 plus actual cost for in-house and external review of Development Proposals - see below
|
|
Application for Consent/Severance/Validation of Title (Sections 53 and 57 of the Planning Act)
|
|
$575.00 |
|
Severance Agreement - Administration fee - First agreement
|
|
$500.00 plus actual costs for in-house and external review of Development Proposals - see below |
|
Severance Agreement - each additional lot that was part of the original severance
|
|
$0.00 plus actual costs for in-house and external review of Development Proposals - see below |
|
Site Plan Agreement - Administration Fee
|
|
$1,000.00 plus actual costs for in-house and external review of Development Proposals - see below |
|
Planning and Development Agreement - Administration Fee
|
|
$1,000.00 plus actual costs for in-house and external review of Development Proposals - see below |
|
Amendment to Planning and Development Agreements (Severance, Site Plan, Subdivision, Condominium) - Administration Fee |
|
$500.00 plus actual costs for in-house and external review of Development Proposals - see below |
|
In-house review of Development Proposals |
Internal staff time and expenses related to engineering that go beyond typical Township comments on an application. Generally applied to review of plans, specifications, terms, etc. for incorporation into and for preparation of agreements. |
Actual staff costs (Wages & OH) plus 15% Administration fee to a max. of $1,000.00 for Admin Fee |
|
External review of Development Proposals (Engineering, Legal, Planning, other consultants) |
Internal staff time and expenses related to engineering that go beyond typical Township comments on an application. Generally applied to review of plans, specifications, terms, etc. for incorporation into and for preparation of agreements. |
Actual costs plus 15% Administration fee to a max. of $1,000.00 for Admin Fee |
|
Application for Part Lot Control
|
|
$800.00 |
|
Staff review of Green Initiatives construction projects
|
|
$1,000.00 plus HST |
|
Comment/Letter - Telecommunications Towers
|
Review of application, preparation of report, Council comment submitted to proponent |
$500.00 |
|
Cash-in-Lieu of Parkland Fee - Residential Severance
|
Per severed lot. Applies to residential lot Severances / Consents only. |
$1,750.00 / Residential Lot Created |
|
Cash-in-Lieu of Parkland Fee - All Subdivision of Land except Residential Severances
|
As per the Planning Act Section 51.1
|
Industrial / Commercial Purposes - 2% of land value.
All other Purposes (Residential) - 5% of land value.
|
|
Cash-in-Lieu of Parkland Fee (lot line adjustments)
|
|
$0.00 no charge |
|
Pre-consultation meeting with Planner (non-refundable) and only charged after 2nd meeting
|
|
$200.00 |
|
Any legal or consulting fees over and above established rates will be added to all planning fees. |
|
|
|
Fees are charged per lot, where applicable
|
|
|
|
*Additional fees from Lower Thames Valley Conservation Authority (LTVCA) may be applicable depending on the planning application. For a full list of LTVCA Fees please visit their website.
|
Public Works
|
Item
|
Description/Notes
|
Amount
|
All new Road Occupancy Permits off municipal roads
|
|
$250.00
|
Entrance Bond
|
Deposit - refundable |
$1,000.00 |
Work under roadway bond
|
Deposit - refundable |
$1,000.00 |
911 Sign - new sign (sign and post) |
Sign and Post |
$100.00 HST Included |
911 Sign - Replacement |
Sign Only |
$50.00 HST Included |
|
Water User Fees |
Item | Description/Notes | Amount |
Basic quarterly charge for water service |
|
$43.20 |
Consumption charge |
per cubic meter |
$2.870 |
Southwold Capital Infrastructure Rate (Lynhurst) |
per cubic meter |
$1.639 |
Water filling station |
per cubic meter |
$3.440 |
Dutton-Dunwich (Tri County Rate) |
per cubic meter |
$2.130 |
Water meter charge |
3/4 inch meter |
$650.00 plus HST |
Water meter charge |
larger than 3/4 inch meter |
Actual cost plus 15%, administration to a $1,000.00 maximum and inspection fee of $225.00 |
Shut-off and/or reconnection charge for non-payment of account |
during normal business hours |
$80.00 |
Shut-off and/or reconnection charge for non-payment of account |
after normal business hours |
$260.00 |
Shut-off and/or reconnection charge at Customer's request |
during normal business hours and 48 hours notice given to Township |
$53.00 |
Shut-off and/or reconnection charge at Customer's request |
after normal business hours |
$260.00 |
Non-metered Quarterly Consumption charge |
based on consumption of 60.6 cu m x 2.5 |
$434.81 |
Disconnection fee for discontinuing water service and billing |
|
$260.00 |
Failure to install remote read out |
|
$55.00 |
Township plumbing fees |
|
included in meter charge |
Malfunctioning/testing of meters |
|
cost of a new meter per Schedule "A" to By-Law |
Frost plate and gasket |
|
cost plus $30.00 administration fee plus HST |
Final reads |
|
$37.00 |
Work orders |
|
$37.00 |
Water fill station key - deposit for new accounts |
|
$130.00 |
Charge for installation of lock box for unauthorized use of water |
|
$160.00 |
Charge for mailing of registered letter |
|
cost plus $6.00 administration fee plus HST |
Construction water |
|
$160.00 |
Item | Description/Notes | Amount |
2 Inch Meter |
Township Fire Protection Rate (annual) - By-law 2023-64 |
$729.64 |
3 Inch Meter |
Township Fire Protection Rate (annual) - By-law 2023-64 |
$863.65 |
4 Inch Meter |
Township Fire Protection Rate (annual) - By-law 2023-64 |
$2,265.37 |
5 Inch Meter |
Township Fire Protection Rate (annual) - By-law 2023-64 |
$2,871.71 |
6 Inch Meter |
Township Fire Protection Rate (annual) - By-law 2023-64 |
$3,493.85 |
8 Inch Meter |
Township Fire Protection Rate (annual) - By-law 2023-64 |
$5,019.96 |
10 Inch Meter |
Township Fire Protection Rate (annual) - By-law 2023-64 |
$11,293.26 |
|
Water Connection Fees |
Item | Description/Notes | Amount |
General Connections |
1" Connection |
|
$16,262.00 |
1.5" Connection |
|
$21,626.00 |
2" Connection |
|
$24,391.00 |
4" Connection |
|
$27,156.00 |
6" Connection |
|
$31,587.00 |
Settlement Area Connections |
1" Connection |
|
$10,570.00 |
1.5" Connection |
|
$14,058.00 |
2" Connection |
|
$15,855.00 |
4" Connection |
|
$17,653.00 |
6" Connection |
|
$20,532.00 |
Subdivision Development Connections |
1" Connection |
|
$5,171.00 |
1.5" Connection |
|
$6,878.00 |
2" Connection |
|
$7,756.00 |
4" Connection |
|
$8,635.00 |
6" Connection |
|
$10,045.000 |
|
|
|
Additional Curbstop |
|
$1,696.00 |
|
Sewer User Fees |
Item | Description/Notes | Amount |
Sewer rate - Talbotville Sanitary Sewer System |
|
$2.71 per cubic meter |
Sewer rate - St. Thomas Sanitary Sewer System |
|
$2.71 per cubic meter |
Flat rate |
Capital requirements for sewer system |
$22.74 per month |
Late payment penalty |
charged on all wastewater billings the day following due date |
5% |
|
Sewer Connection Fees |
Item | Description/Notes | Amount |
Talbotville Wastewater Treatment Plant |
Single Family Dwelling |
|
$18,462.00 |
Semi-Detached Dwelling |
|
$18,462.00 |
Duplex |
|
$18,462.00 |
Townhouse |
|
$18,462.00 |
Row House |
|
$18,462.00 |
Other Multiple Dwelling types with Individual Sanitary Sewer Connections |
|
$18,462.00 |
Apartment Buildings |
|
$12,850.00 |
1" Water Service (per connection) |
Commercial/Industrial - based on Water Connection Service Size |
$18,462.00 |
1.5" Water Service (per connection) |
Commercial/Industrial - based on Water Connection Service Size |
$24,553.00 |
2" Water Service (per connection) |
Commercial/Industrial - based on Water Connection Service Size |
$27,695.00
|
Over 2" Water Service |
Commercial/Industrial - based on Water Connection Service Size |
To be reviewed individually and fee included in development agreement |
High Water/Wastewater Users |
Commercial/Industrial - based on Water Connection Service Size |
To be reviewed individually and fee included in development agreement |
|
|
|
Other Sanitary Sewer Treatment Jurisdictions (Ferndale, Lynhurst) |
All new connections |
|
Subject to connection fees and other charges applied by the receiving sanitary sewer system |
Private Drain Connections (PDC) Charges |
Single Detached, Semi-Detached, Duplex Dwellings – Services provided by the Engineer/Contractor for repair, replacement, installation |
|
The installation or replacement of a Sanitary Sewer PDC to the property line in conjunction with a Township construction project that involves the construction of a Sanitary Sewer main |
|
$2,000.00 |
The installation or replacement of a Storm Sewer PDC to the property line in conjunction with a Township construction project that involves the construction of a Storm Sewer main |
|
$2,000.00 |
Repair or replace existing PDC – no construction |
|
Actual cost |
Other Property Types – Services provided by the Engineer/Contractor for repair, replacement, installation |
|
The installation or replacement of a Sanitary Sewer PDC to the property line in conjunction with a Township construction project that involves the construction of a Sanitary Sewer main; |
|
$4,000.00 |
The installation or replacement of a Storm Sewer PDC to the property line in conjunction with a Township construction project that involves the construction of a Storm Sewer main |
|
$4,000.00 |
|
Development Charges
|
2024 Township of Southwold Development Charges Pamphlet
Full Calculated Development Charges - see below for phased-in charges by year
Service/Class | Residential | Non-Residential |
|
Single and Semi-Detached Dwelling |
Apartments - 2 Bedrooms + |
Apartments - Bachelor and 1 Bedroom |
Other Multiples |
(per sq. ft. of Gross Floor Area) |
Roads and Related |
$4,301
|
$2,339
|
$1,498
|
$2,993
|
$2.16 |
Fire Services |
$1,681
|
$913
|
$586
|
$1,170
|
$0.86 |
Parks and Recreation Services |
$2,021
|
$1,098
|
$703
|
$1,406
|
$0.25 |
Library Services |
$0
|
$0
|
$0
|
$0
|
$0.00
|
Growth Studies |
$262
|
$142
|
$91
|
$181
|
$0.13 |
Total Municipal Wide Services/Classes |
$8,265
|
$4,492
|
$2,878
|
$5,750
|
$3.40 |
January 1, 2024 to December 31, 2024
Service/Class | Residential | Non-Residential |
|
Single and Semi-Detached Dwelling |
Apartments - 2 Bedrooms + |
Apartments - Bachelor and 1 Bedroom |
Other Multiples |
(per sq. ft. of Gross Floor Area) |
Roads and Related |
$4,012
|
$2,181
|
$1,397
|
$2,792
|
$2.01 |
Fire Services |
$1,568
|
$851
|
$547
|
$1,091
|
$0.81 |
Parks and Recreation Services |
$1,885
|
$1,024
|
$655
|
$1,312
|
$0.24 |
Library Services |
$0
|
$0
|
$0
|
$0
|
$0.00
|
Growth Studies |
$244
|
$132
|
$85
|
$169
|
$0.12 |
Total Municipal Wide Services/Classes |
$7,709
|
$4,188
|
$2,684
|
$5,364
|
$3.18 |
|